                   GENERAL TERMS AND CONDITIONS
                           (Continued)


1.  DEFINITIONS (Continued)

    1.23  "Gas Used by Paiute" means system shrinkage associated with
          compressor fuel, power generation fuel, boiler fuel and lost and
          unaccounted for gas while Shipper's gas is in Paiute's possession.

    1.24  "Gross Heating Value" means the number of British Thermal Units
          produced by the combustion in a calorimeter, at constant pressure,
          of the amount of gas which would occupy a cubic foot as defined
          above, on a water-free basis, with air of the same temperature and
          pressure as the gas, when the products of combustion are cooled to
          the initial temperature of the gas and air and when the water
          formed by the combustion is condensed to the liquid state, or by
          such other generally accepted method (e.g. gas chromatography) of
          determining heating value.

    1.25  "High Priority" is defined as Priority 1, Priority 2a, Priority 2b
          and Priority 2c.

    1.26  "Hospital" means service to a facility engaged primarily in
          providing medical care to patients who remain at the facility
          including nursing and convalescent homes. Outpatient clinics or
          doctors' offices are not included in the definition.

    1.27  "Industrial" means service to customers engaged primarily in a
          process which creates or changes raw or unfinished material into
          another form or product, including the generation of electric
          power.

    1.28  Intra-day Nomination: A Nomination submitted after the Nomination
          deadline whose effective time is no earlier than the beginning of
          the Gas Day and runs through the end of that Gas Day. 

    1.29  "Low Priority" is defined as Priority 3, Priority 4, Priority 5 and
          Priority 6.

    1.30  "LNG Plant" means Paiute's Harold G. Laub liquefied natural gas
          facilities located near Lovelock, Nevada.

    1.31  "LNG Receipt Point" is defined as the outlet from Paiute's Harold
          G. Laub liquefied natural gas plant located near Lovelock, Nevada