TF03      660040005P126Fourth Revised Sheet No. 66
TF04                Third Revised Sheet No. 66
TF05Edward C. McMurtrie, Vice President/General Manager
TF06100506                      110506
                      GENERAL TERMS AND CONDITIONS
                                (Continued)

4.  OPERATING PROCEDURES (Continued)

    4.3  Limitation Upon Paiute's Daily Transportation Obligation and
         Flexible Delivery and Receipt Point Criteria: (Continued)
         
         (7)  Under no circumstances shall a firm shipper's flexible
              delivery or receipt points allow such shipper to receive 
              deliveries of gas on any day in excess of its Daily 
              Reserved Capacity or Summer Daily Reserved Capacity, 
              whichever is applicable.
                  
    4.4  Determination of Receipts and Deliveries:
    	 
    	 As a general guideline, all gas received or delivered by
    	 Paiute on any day at a particular point that is being 
    	 transported pursuant to a single transportation rate schedule 
    	 under this tariff, and that is commingled with gas being 
    	 transported for other Shippers under the same rate schedule, 
    	 shall be determined to be received by Paiute or delivered to 
    	 each Shipper pro rata on the basis of the schedule established 
    	 for such day pursuant to Section 4.2 hereof. When gas received 
    	 or delivered on any day at a particular point is being 
    	 transported pursuant to more than one (1) rate schedule under 
    	 this tariff, the determination of receipts and deliveries 
    	 shall be as follows:
    	 
    	 (a)  Determination of Receipts:
    	 	  
    	 	  This section applies to those situations where the gas 
    	 	  received by Paiute into its facilities for a Shipper is 
    	 	  applicable to more than one transportation agreement.
    	 	  
    	 	  (1)  First - Volumes scheduled for payback from Shipper to 
    	 	       Paiute under Rate Schedule FT-1 received at a Receipt 
    	 	       Point;
    	 	  
    	 	  (2)  Second - Volumes scheduled from the LNG Plant that are 
    	 	       transported under Rate Schedule FT-1;
    	 	  	   
    	 	  (3)  Third - Volumes scheduled from and confirmed by an 
    	 	       upstream pipeline to Paiute for transportation by 
    	 	       Paiute under Rate Schedule FT-1;
    	 	  	  
    	 	  (4)  Fourth - Volumes scheduled for payback from Shipper 
    	 	       to Paiute under Rate Schedule IT-1 received at a 
    	 	       Receipt Point;