TF03 680010005P126First Revised Sheet No. 68 TF04 Original Sheet No. 68 TF05Edward C. McMurtrie, Vice President/General Manager TF06110503 120903 GENERAL TERMS AND CONDITIONS (Continued) 4. OPERATING PROCEDURES (Continued) 4.4 Determination of Receipts and Deliveries: (Continued) (c) The Receiving Party shall be responsible for all imbalances in accordance with Section 5.4 of Paiute's General Terms and Conditions. 4.5 Hourly Limitations: Paiute, due to the configuration of its pipeline system, may need to establish a limit upon the hourly quantity that it can deliver at a particular Delivery Point. Any such limitation shall be spe- cified in the executed Service Agreement between Shipper and Paiute, and shall be set forth below: Maximum Daily Maximum Hourly Point of Delivery Quantity (Dth) Quantity (Dth) _________________ ______________ ______________ Tracy Power Generator 53,982 2,249 Fort Churchill Power Generator 54,826 2,284 Avista Corporation 17,908 1,000 4.6. Interruptions or Curtailment of Service: (a) Tests and Repairs: Paiute shall have the right to curtail or interrupt the transportation of gas for Shipper when neces- sary to test, alter, modify, enlarge or repair any facility or property comprising a part of, or appurtenant to, Paiute's pipeline system, or otherwise related to the operation thereof. Paiute shall endeavor to cause a minimum of incon- venience to Shipper because of such interruptions. (b) Operational Control: Paiute shall retain full operational control of its pipeline system and shall at all times be entitled to schedule receipts and to operate its pipeline system in a manner which is consistent with the obligations and operating limitations set forth in Sections 2 and 5 of Rate Schedule FT-1, Section 2 of Rate Schedule IT-1, Sections 2 and 6 of Rate Schedule LGS-1 and Sections 3, 4, 5, 6 and 10