Prev Next Download
TF03      680010005P126First Revised Sheet No. 68
TF04                Original Sheet No. 68 
TF05Edward C. McMurtrie, Vice President/General Manager
TF06110503                      120903
                       GENERAL TERMS AND CONDITIONS
                                (Continued)


4.  OPERATING PROCEDURES (Continued)

    4.4   Determination of Receipts and Deliveries: (Continued)

          (c) The Receiving Party shall be responsible for all imbalances
              in accordance with Section 5.4 of Paiute's General Terms and
              Conditions.

    4.5   Hourly Limitations:

          Paiute, due to the configuration of its pipeline system, may need
          to establish a limit upon the hourly quantity that it can deliver
          at a particular Delivery Point. Any such limitation shall be spe-
          cified in the executed Service Agreement between Shipper and
          Paiute, and shall be set forth below:

                                          Maximum Daily   Maximum Hourly
          Point of Delivery               Quantity (Dth)  Quantity (Dth)
          _________________               ______________  ______________

          Tracy Power Generator                53,982           2,249
          Fort Churchill Power Generator       54,826           2,284
          Avista Corporation                   17,908           1,000

    4.6.  Interruptions or Curtailment of Service:

          (a) Tests and Repairs: Paiute shall have the right to curtail or
              interrupt the transportation of gas for Shipper when neces-
              sary to test, alter, modify, enlarge or repair any facility
              or property comprising a part of, or appurtenant to, Paiute's
              pipeline system, or otherwise related to the operation
              thereof. Paiute shall endeavor to cause a minimum of incon-
              venience to Shipper because of such interruptions.

          (b) Operational Control: Paiute shall retain full operational
              control of its pipeline system and shall at all times be
              entitled to schedule receipts and to operate its pipeline
              system in a manner which is consistent with the obligations
              and operating limitations set forth in Sections 2 and 5 of
              Rate Schedule FT-1, Section 2 of Rate Schedule IT-1, Sections
              2 and 6 of Rate Schedule LGS-1 and Sections 3, 4, 5, 6 and 10


Prev Next Download