TF03     73A0000005P126Original Sheet No. 73A
TF04
TF05Edward C. McMurtrie, Vice President/General Manager
TF06110503                      120903
                       GENERAL TERMS AND CONDITIONS
                                 (Continued)

4.  OPERATING PROCEDURES (Continued)

    4.6.  Interruptions or Curtailment of Service: (Continued)
  
                 e.   In the event that diverted Low Priority volumes are
                      not sufficient to prevent High Priority curtailment,
                      then all High Priority Shipper(s) will share in the
                      High Priority curtailment beginning with Priority 2c
                      volumes. Curtailment will be pro rata within a given
                      priority and will continue until Priority 1 load is
                      protected across the Paiute system. 

                 f.   In the event an electric utility declares that cur-
                      tailment of Low Priority gas service would create a
                      fir Load Electrical Emergency, the volumes required
                      to forestall such Firm Load Electrical Emergency will
                      be deemed to be Priority 1 volumes for the purposes of
                      curtailment during the specific instance.

                 g.   Firm Shipper(s) receiving diverted supplies will reim-
                      burse those Shipper(s) being curtailed for their costs
                      of acquiring and having transported such supplies in
                      addition to their incremental costs in acquiring their
                      least cost alternative energy needs available to the
                      Shipper during such period of curtailment.