TF03 73A0000005P126Original Sheet No. 73A TF04 TF05Edward C. McMurtrie, Vice President/General Manager TF06110503 120903 GENERAL TERMS AND CONDITIONS (Continued) 4. OPERATING PROCEDURES (Continued) 4.6. Interruptions or Curtailment of Service: (Continued) e. In the event that diverted Low Priority volumes are not sufficient to prevent High Priority curtailment, then all High Priority Shipper(s) will share in the High Priority curtailment beginning with Priority 2c volumes. Curtailment will be pro rata within a given priority and will continue until Priority 1 load is protected across the Paiute system. f. In the event an electric utility declares that cur- tailment of Low Priority gas service would create a fir Load Electrical Emergency, the volumes required to forestall such Firm Load Electrical Emergency will be deemed to be Priority 1 volumes for the purposes of curtailment during the specific instance. g. Firm Shipper(s) receiving diverted supplies will reim- burse those Shipper(s) being curtailed for their costs of acquiring and having transported such supplies in addition to their incremental costs in acquiring their least cost alternative energy needs available to the Shipper during such period of curtailment.