TF03 74B0010005P126First Revised Sheet No. 74B TF04 Original Sheet No. 74B TF05Edward C. McMurtrie, Vice President/General Manager TF06110503 120903 GENERAL TERMS AND CONDITIONS (Continued) 4. OPERATING PROCEDURES (Continued) 4.7 Operating Procedures for Rate Schedule LGS-1 Service: (Continued) (4) As between Paiute and Shipper, Shipper shall be solely responsible for making all arrangements for having LNG transported by truck for delivery to the LNG Plant, and for ensuring compliance with all federal, state, and local laws and regulations applicable to the transporta- tion of LNG by truck. (c) Storage of Liquid: The storage of LNG by Paiute shall be sub- ject to the following: (1) Paiute shall operate the storage tank in a safe and reasonable manner. Subject to Section 4.10 hereof, any losses of inventory from the facilities shall be the sole responsibility of the owner of the inventory. (2) The ownership of LNG in storage at any given time will be determined by good accounting practices, subject to a material balance audit once each twelve (12) calen- dar months corresponding with the beginning of the Winter Period. a. Shipper's inventory at the LNG Plant will be equal to Shipper's natural gas tendered to the LNG Plant, plus LNG tendered by Shipper to the LNG Plant at the LNG truck unloading facility, less: (1) the with- drawals of Shipper's gas, (2) the measurable boil- off and fuel attribution to Shipper, and (3) the allocation of any lost or unaccounted for gas deter- mined at the time of the audit which is assigned to each Shipper. b. The results of the audit and detailed workpapers of such audit will be provided to each Shipper within twenty (20) days of the completion of the audit.