TF03      790010005P126First Revised Sheet No. 79
TF04                Original Sheet No. 79  
TF05Edward C. McMurtrie, Vice President/General Manager
TF06110503                      120903
                       GENERAL TERMS AND CONDITIONS
                                (Continued)


4.  OPERATING PROCEDURES (Continued)

    4.7   Operating Procedures for Rate Schedule LGS-1 Service: (Continued)

                   service on such day under Rate Schedule LGS-1, provided
                   however, that if the restrictions on Paiute's ability to
                   provide service are due to restraints on the pipeline
                   capacity to make delivery to Shipper's Delivery
                   Point(s), Shipper shall be curtailed in accordance with
                   the procedures set forth in the applicable transpor-
                   tation rate schedule prior to implementing curtailment
                   under the procedure set forth herein.

              (4)  Paiute shall have the right to adjust Shipper's sched-
                   uling of gasification and delivery of gas from the LNG
                   Plant to reflect the withdrawal of Shipper's inventory
                   pursuant to Section 4.7(c)(3) hereof. Paiute shall notify
                   Shipper of any adjustment as soon as practical.

    4.8   Arrangements Prior to Receipt and After Delivery:

          It shall be Shipper's obligation to make arrangements with other
          parties and make payments for delivery of gas into Paiute's
          system at the Receipt Point(s) and for receipt of gas after
          transportation to the Delivery Point(s). Shipper shall be obli-
          gated in such arrangements to require daily dispatching and
          operating coordination by such other parties with Paiute and
          access by Paiute to appropriate charts and records of upstream
          pipelines. Such arrangements must be satisfactory to Paiute.